2*2ft MW&SMD3030, 150W LED Linear High Bay

FOB Price:USD 77.0-108.0/Piece Get Latest Price
Model:HBL6060-150WD-01B
Certification:ETL,DLC,FCC,CE,ROHS
Capable:UL,TUV
Minimum Order:1PC
Brand Name:CORE-LED
Brief Description:22ft MW&SMD3030, 150W LED Linear High BayCertification: ETL/CETL, DLC, FCC.Function:0-10V/PWMdimmable.Motion sensor

Eileen Core

  • Product Details

Basic Specification

CertificationETL/DLC/CE/ROHS/FCC
Power150W
VoltageAC120-277V/AC347V
Warranty5 YEARS
Function0-10VDIM, Motion Sensor,Emegency Power
Voltage85-277V
IPIP54
Light SourceLED
MaterialIron, PC

Detail Description

  • 2*2ft MW&SMD3030, 150W LED Linear High Bay
  • Features:
  • Appearance design patent, Unique and Ultrathin.

  • High luminous Efficiency: 146LM/W. 

  • International famous brand:PhilipsLumileds and Meanwell.

  • Certification: ETL/CETL, DLC, FCC.

  • 50,000 hours lifespan, 5 years Warranty

  • Function:0-10V/PWMdimmable.Motion sensor or Optical sensor ,etc

 

Specification of 150W led linear high bay:

 

Demension Drawing of led linear high bay:

Detail pictures of 150W led linear high bay:

 

Installation:

1. Chain hanging


Inspect the fixture condition and accessories before installation. To install with optional Chain or conduit pendant kit.

a) Hook the V-Hook into two end of the luminaire in the holes, attach the V-hook

on chains which should be attached on the ceiling. 

Remove the access plate, take the wires out of the power driver compartment and through the hole of access plate, make wiring and re-install the access plate, then plug the flexible conduit into the hole of the access plate.

 

 

2. Conduit pendant

b) Remove the access plate, take the wires out of the power driver compartment.

and through the hole of access plate, re-install the access plate, fix the bottom cover on back plate of fixture with M4*6 screws provided.

Thread the 3/4 inch conduit into the hole of upper box, and screw the nut at end of conduit to hold the upper box, (nut is provided by others),  attach the fixture to upper box by hooking 2 feet of bottom cover into slot of upper box, make wiring. Tilt the fixture to horizontal, secure the box on the bottom cover with screws provided.

 

 

Certification

 

Our International Lighting Fairs:

1. we have  attent for guangzhou Lighting Fair from 2011 to 2014 years;

2. We have attent for HK International Lighting Fair from 2011 to 2014 years

3. we will attend HK International Lighting Fair on April 6-9th, 2015;

4. We will attend HK International Lighting Fair on Oct 27-30th, 2015;

5. We have attent Frankfurt Lighting Fair at Germany on Mar 13-18th, 2016;

6. We have attent HK Spring Lighting Fair on April 6-9th,2016;

7. We have attent Miami Construction Show on May 20-22nd, 2016;

8. We have attent HK Autumn Lighting Fair on Oct 27-30th,2016;

9. We have attent HK Spring Lighting Fair on April 6-9th, 2017;

10. We have attent Light Fair International at Philadelphia, PA on May 9-11th, 2017

11. We will attend International Autumn lighting fair on Oct 27-30th,2017


 

Additional Information

Payment TermsL/C, T/T, Western Union, Paypal
Minimum Order1PC
Lead Time / Delivery Time5 Day(s)
Sample AvailableYES Ask For Sample
Delivery Details3-5 days for trial order, 15 days for containers
FOB PortGuangzhou,Hong Kong,Shekou,
Loading InfoAir, Express and Sea
Packing Info1pc per carton, 40pcs per wood pallet, 480pcs as 20" containers
Target Market(s)North America, Eastern Europe, Western & Southern Europe, Northern Europe

Send your message to this manufacturer


3000
SearchPost Buying Lead